Documentation
Back to guides list
Prev
Back to guides list

Virtuozzo Infrastructure Platform 2.5 Hardware Appliance Installation Guide

Version 2.5 — Jun 27, 2018
  • 1. Safety Instructions
  • 2. Virtuozzo Hardware Appliance Overview
    • 2.1. Box Contents
    • 2.2. Components
    • 2.3. Technical Specifications
    • 2.4. Environmental Specifications
  • 3. Requirements
  • 4. Installing Virtuozzo Hardware Appliance
    • 4.1. Installing into Rack
    • 4.2. Connecting Cables to Appliance
    • 4.3. Performing Initial Configuration
  • 5. Creating Virtuozzo Infrastructure Platform Cluster
  • Virtuozzo Infrastructure Platform 2.5 Hardware Appliance Installation GuidePDF, 0 KB
Prev

5. Creating Virtuozzo Infrastructure Platform Cluster¶

Embed parts from admin guide. Tailor to the specific config of the appliance. E.g.:

  • 2.1. Configuring Node Network Interfaces
  • 2.2. Creating the Virtuozzo Infrastructure Platform Cluster
Version 2.5 — Jun 27, 2018
Edit Raw Print Share
Prev
GPG Keys Legal Privacy Policy